Bathroom Upgrades

Full bathroom installations and renovations. Plumbing, tiling, electrics, and ventilation handled in-house by our coordinated team.

Discuss Your Project

What's Included

Complete strip-out of existing bathroom
Plumbing: new pipework, waste, and water supply
Electrics: lighting, extractor fan, underfloor heating if required
Tanking and waterproofing to wet areas
Floor and wall preparation
Tiling to walls and floors
Sanitaryware installation: bath, shower, toilet, basin
Final finishes: sealing, grouting, painting, and snagging

Our Process for Bathroom Upgrades

1

Design & Planning

Discuss layout, sanitaryware, and finishes. Assess plumbing routes and ventilation requirements.

2

Strip-Out & First Fix

Remove existing bathroom, install new plumbing and electrics, prepare floors and walls.

3

Waterproofing & Tiling

Tank wet areas, install underfloor heating if required, tile walls and floors to your specification.

4

Second Fix & Completion

Install sanitaryware, connect plumbing, fit accessories, grout, seal, and final decoration.

Featured Bathroom Work

Bathroom renovations completed for clients across Greater London, from compact en-suites to luxury family bathrooms.

Contemporary bathroom with walk-in shower
Family bathroom with freestanding bath
Modern en-suite with wall-hung vanity

Why Choose Pimi for Bathroom Upgrades

Certified Plumbers

All our plumbers are Gas Safe registered and qualified to issue certificates. We handle all Building Control notifications for bathroom work.

Waterproofing Expertise

Proper tanking is critical in wet rooms and shower areas. We use quality systems and follow manufacturer specifications to prevent leaks.

Coordinated Trades

Our plumber, electrician, and tiler work together daily. They coordinate routes for pipes and cables to avoid clashes and rework.

Typical Timeline

Basic Bathroom Refresh (like-for-like)
1-2 weeks from start to completion
Full Bathroom Renovation (new layout)
2-3 weeks from start to completion
En-Suite Installation (new room)
2-3 weeks from start to completion
Wet Room Conversion
2-4 weeks from start to completion

Budget Guidance

Bathroom costs depend on size, sanitaryware quality, and tiling choice:

  • Basic bathroom (standard spec): £5k-£8k
  • Mid-range bathroom: £8k-£14k
  • High-end bathroom: £15k-£25k+
  • Wet room (inc. tanking): £12k-£22k

Prices include all labour, materials, sanitaryware, and tiling. Underfloor heating adds £800-£1,500.

Frequently Asked Questions

How long will we be without a bathroom?

Typically 1-3 weeks depending on the scope of work. We work efficiently to minimise disruption. Many clients use another bathroom in the house or arrange temporary facilities.

Do you supply the sanitaryware and tiles?

We can supply everything through our trade suppliers, or you can choose your own from showrooms. We advise on suitability and handle all installation.

What is tanking and why is it important?

Tanking is waterproofing wet areas to prevent water ingress into walls and floors. Critical in showers and wet rooms. We use quality systems like BAL or Mapei and follow manufacturer specifications.

Can you install underfloor heating?

Yes, we install electric underfloor heating mats before tiling. Adds comfort and helps dry the room quickly. Typically adds 1-2 days to the programme.

Do I need Building Control for bathroom work?

Major bathroom work (new rooms, structural changes) requires Building Control notification. We handle all submissions and arrange inspections.

Ready to upgrade your bathroom?

Message us on WhatsApp for a quick response, or book a site visit to discuss your layout and finishes.