Service

Kitchen Upgrades

Complete kitchen renovations from design to installation. We manage the whole space and coordinate all trades to deliver a kitchen that works for how you live.

Discuss Your Project

What's Included

Complete strip-out of existing kitchen
First-fix: new electrics, plumbing, heating, and ventilation
Structural changes: knocking through walls, installing RSJs
Floor preparation and screeding if required
Wall preparation: plastering, tiling, painting
Kitchen furniture supply coordination (or we work with your chosen supplier)
Worktop templating and installation
Second-fix: sockets, lighting, appliance installation, final finishes

Our Process for Kitchen Upgrades

1

Design & Planning

We discuss your layout, appliances, and workflow. Coordinate with kitchen suppliers and finalise exact scope.

2

Strip-Out & First Fix

Remove existing kitchen, complete all structural work, install new electrics, plumbing, and heating.

3

Preparation & Installation

Prepare walls and floors, install kitchen units, worktops, and appliances. All trades coordinated.

4

Final Finishes

Tiling, decorating, second-fix electrics, and final snagging. Kitchen ready to use.

Featured Kitchen Work

Recent kitchen transformations for clients across Greater London, from compact galley redesigns to spacious open-plan family kitchens.

Modern open-plan kitchen with quartz worktops
Contemporary shaker kitchen with island
Handleless kitchen with integrated appliances

Why Choose Pimi for Kitchen Upgrades

We Manage the Whole Space

We coordinate all trades from plumbers to electricians to tilers. You deal with one team, not five different subcontractors who do not talk to each other.

Work With Your Supplier

Choose your own kitchen furniture or work with suppliers we recommend. We template, install, and ensure everything fits properly.

Minimise Downtime

We understand your kitchen is the heart of your home. We work efficiently to minimise the time you are without a working kitchen.

Typical Timeline

Basic Kitchen Refresh (like-for-like)
2-3 weeks from start to completion
Full Kitchen Renovation (new layout)
4-6 weeks from start to completion
Kitchen with Structural Changes
6-8 weeks from start to completion
Kitchen Extension (combined project)
10-14 weeks from start to completion

Budget Guidance

Kitchen costs vary hugely based on furniture choice and appliances:

  • Build work only (no furniture): £8k-£15k
  • Mid-range kitchen (inc. furniture): £20k-£35k
  • High-end kitchen (inc. furniture): £40k-£70k+

Furniture costs typically account for 40-60% of total spend. We provide transparent itemised quotes.

Frequently Asked Questions

Can we still use the kitchen during the work?

Not during the main build phase. We typically set up a temporary kitchen in another room with kettle, microwave, and washing-up facilities. The disruption usually lasts 2-6 weeks depending on scope.

Do you supply the kitchen furniture?

We can supply furniture through our trade contacts or work with your chosen supplier. Many clients choose their own to get exactly what they want. We template, install, and ensure it all fits.

What if my kitchen layout requires structural changes?

We handle structural alterations including knocking through walls and installing RSJs. Our structural engineer will calculate beam sizes and we liaise with Building Control.

How do you coordinate with the kitchen furniture supplier?

We attend their site survey, review their plans, and coordinate installation timing. We complete all first-fix work before their fitters arrive, then handle second-fix after units are in.

What about appliances?

You supply and we install, or we can source appliances through our trade suppliers. We install, connect, and test all appliances as part of the project.

Ready to upgrade your kitchen?

Message us on WhatsApp for a quick response, or book a site visit to discuss your layout and options.